What to know about Talty
Talty's building-inspection guidance says temporary power poles for construction are coordinated with TVEC and a meter supplies power during the project. Source: taltytexas.com.
For the incorporated-place boundary, see the Census reference for Talty. Confirm the actual site access and utilities with the property owner.
Talty requires a permit before construction and annual registration for subcontractors. Source: taltytexas.com.
For a Talty construction-site refrigeration or food-service trailer, verify metered temporary power and required permits before delivery.
Talty at a glance
- Population
- 3,299
- Place type
- Incorporated town
- County
- Kaufman
The U.S. Census Bureau table reports a July 1, 2025 population estimate for this incorporated town. It is an estimate, not a current headcount. Texas place population table.
Plan temporary refrigeration for the actual site
For a cold-storage project, specify the product, required holding temperature, stock volume, door traffic, available power and receiving route. Confirm the exact equipment against the project address and operating plan.

Prepare a useful Talty site brief
- Address and access. Share the exact site, placement surface, clearance, turning route and unloading point.
- Operations. State the dates, staffing or visitor pattern, daily volume and any restrictions on deliveries or servicing.
- Utilities. Document available power, potable water, wastewater arrangements and who will approve connections.
- Equipment fit. Describe the function, capacity and workflow so the team can check a proposed unit rather than relying on a category name alone.