What to know about Combine
Combine's building-permit guide says commercial construction applications require paper copies and are reviewed by Bureau Veritas for city ordinances, building codes, and setbacks. Source: cms8.revize.com.
For the incorporated-place boundary, see the Census reference for Combine. Confirm the actual site access and utilities with the property owner.
The guide says permits are valid 180 days and lists a 5–10 business-day plan-review goal, longer if corrections are needed. Source: cms8.revize.com.
For a Combine commercial site that needs a new slab, circuit, or plumbing for temporary equipment, account for paper plan submittal and the city's review before installation.
Combine at a glance
- Population
- 2,769
- Place type
- Incorporated city
- Counties
- Kaufman, Dallas
The U.S. Census Bureau table reports a July 1, 2025 population estimate for this incorporated city. It is an estimate, not a current headcount. Texas place population table.
Plan basecamp support for the actual site
For a temporary basecamp, plan sleeping, meals, sanitation, laundry, supply deliveries and waste collection as one operating layout. Confirm the exact equipment against the project address and operating plan.

Prepare a useful Combine site brief
- Address and access. Share the exact site, placement surface, clearance, turning route and unloading point.
- Operations. State the dates, staffing or visitor pattern, daily volume and any restrictions on deliveries or servicing.
- Utilities. Document available power, potable water, wastewater arrangements and who will approve connections.
- Equipment fit. Describe the function, capacity and workflow so the team can check a proposed unit rather than relying on a category name alone.