What to know about Cross Timber
Cross Timber publishes a Temporary Power Application for work sites within the town. Source: crosstimbertx.com.
For the incorporated-place boundary, see the Census reference for Cross Timber. Confirm the actual site access and utilities with the property owner.
The town says temporary-power applications last 30 days; a new one is needed if permanent power has not been released, and the temporary-power inspection must pass before release. Source: crosstimbertx.com.
If a Cross Timber refrigerated trailer depends on temporary site power, submit the town's application and schedule inspection before the equipment delivery date.
Cross Timber at a glance
- Population
- 495
- Place type
- Incorporated town
- County
- Johnson
The U.S. Census Bureau table reports a July 1, 2025 population estimate for this incorporated town. It is an estimate, not a current headcount. Texas place population table.
Plan temporary refrigeration for the actual site
For a cold-storage project, specify the product, required holding temperature, stock volume, door traffic, available power and receiving route. Confirm the exact equipment against the project address and operating plan.

Prepare a useful Cross Timber site brief
- Address and access. Share the exact site, placement surface, clearance, turning route and unloading point.
- Operations. State the dates, staffing or visitor pattern, daily volume and any restrictions on deliveries or servicing.
- Utilities. Document available power, potable water, wastewater arrangements and who will approve connections.
- Equipment fit. Describe the function, capacity and workflow so the team can check a proposed unit rather than relying on a category name alone.