What to know about Severance
Severance asks for park or pavilion reservation requests at least 14 business days before an event, and says a park reservation is always needed for more than 50 participants. Source: townofseverance.org.
For the incorporated-place boundary, see the Census reference for Severance. Confirm the actual site access and utilities with the property owner.
For a Severance park event, confirm the reservation and expected attendance, then review restroom servicing, trash collection and equipment placement with the town before the site plan is fixed.
Severance at a glance
- Population
- 11,841
- Place type
- Incorporated town
- County
- Weld
The U.S. Census Bureau table reports a July 1, 2025 population estimate for this incorporated town. It is an estimate, not a current headcount. Colorado place population table.
Plan temporary restrooms for the actual site
For temporary restrooms, estimate users by shift or event period and check fixture layout, accessible routes, water, wastewater and servicing access. Confirm the exact equipment against the project address and operating plan.

Prepare a useful Severance site brief
- Address and access. Share the exact site, placement surface, clearance, turning route and unloading point.
- Operations. State the dates, staffing or visitor pattern, daily volume and any restrictions on deliveries or servicing.
- Utilities. Document available power, potable water, wastewater arrangements and who will approve connections.
- Equipment fit. Describe the function, capacity and workflow so the team can check a proposed unit rather than relying on a category name alone.
