What to know about Farmington
Farmington's Creekside Park has small and large pavilions with separate approaches from North Hunter Street and Broyles Street. Source: cityoffarmington-ar.gov.
For the incorporated-place boundary, see the Census reference for Farmington. Confirm the actual site access and utilities with the property owner.
The city's pavilion page says a reservation is made when payment is received and directs renters to City Hall for availability. Source: cityoffarmington-ar.gov.
For a Farmington Creekside Park event, specify which pavilion is reserved so a delivery truck does not arrive on the opposite side of the park.
Farmington at a glance
- Population
- 10,658
- Place type
- Incorporated city
- County
- Washington
The U.S. Census Bureau table reports a July 1, 2025 population estimate for this incorporated city. It is an estimate, not a current headcount. Arkansas place population table.
Plan temporary refrigeration for the actual site
For a cold-storage project, specify the product, required holding temperature, stock volume, door traffic, available power and receiving route. Confirm the exact equipment against the project address and operating plan.

Prepare a useful Farmington site brief
- Address and access. Share the exact site, placement surface, clearance, turning route and unloading point.
- Operations. State the dates, staffing or visitor pattern, daily volume and any restrictions on deliveries or servicing.
- Utilities. Document available power, potable water, wastewater arrangements and who will approve connections.
- Equipment fit. Describe the function, capacity and workflow so the team can check a proposed unit rather than relying on a category name alone.
