Refrigeration reference photographs
Reference photographs show examples of the facility layout, not a documented deployment at your project location. Confirm the proposed configuration with your rental team.



Placement and service access
Show the proposed equipment position, surrounding activities and the routes needed for delivery and maintenance. Keep the placement drawing current as barriers, building works and traffic arrangements change.
Use the project-setting checklist to identify site requirements and confirm the relevant arrangements with the responsible contacts. Document the selected equipment and the site information used for the review so a later change can be assessed against the same brief.
- Measured position
- delivery route
- maintenance space
- nearby work and pedestrian movements.
The project setting
Start with the function that has stopped and the people or stock affected. Establish the immediate site contact, safe access and the interim operating plan while the available equipment and delivery arrangements are reviewed.
- Failed function
- current operating restrictions
- responsible site contact
- immediate access information
Record the decision for the proposal
Before confirming the rental, document the following: measured position; delivery route; maintenance space; nearby work and pedestrian movements. Recheck this decision whenever the project-setting information changes, including the following: immediate access information.
Attach the relevant specification or site drawing to the decision. The equipment team and property contact should be reviewing the same configuration and operating assumptions.
Questions for this rental
What information makes this review specific to the project?
Start with the function that has stopped and the people or stock affected. Establish the immediate site contact, safe access and the interim operating plan while the available equipment and delivery arrangements are reviewed. Use that operating context to document the following: measured position; delivery route; maintenance space; nearby work and pedestrian movements.
What should the enquiry include?
Provide the exact project address and required operating dates. Describe the products and their required holding temperatures. Identify who will monitor conditions, replenish stock and respond to incidents. These details help define the equipment and service responsibilities for the proposal.
Does cold storage replace product-handling procedures or validate a specialist process?
Cold storage supports a defined holding plan. It should not be assumed to chill hot production loads, validate a medical process or replace the operator’s product-handling procedures.
